Berita berkelanjutan · 1 laporan

Navajo Nation road closures from flooding

Pertama tayang Terbaru tayang

Sedang berkembang

Perkembangan terkini

As of Nov. 1, 2026, flooding washed out roads and cut access in several Navajo Nation communities, with named routes closed in Piñon, Dilkon, Mexican Springs and Indian Wells, a washed-out road in Red Mesa, and a bridge closed in Chinle. The report does not say whether floodwaters have receded or any affected routes have reopened, so the closures remain unresolved.

Ikuti lewat RSS

Pelacak beritaHari ke-7

1 laporan16 media25 sumber

Perkembangan sejauh ini

  1. Pembaruan ke-1

    Navajo Nation washouts leave road access uncertain beyond the flooding

    November 1 reports identify washouts, bridge restrictions and dangerous crossings across Navajo Nation communities. Which routes have since reopened remains unconfirmed.

    Masih terbuka setelah laporan ini

    • Which affected routes and crossings have subsequently been inspected and reopened, and whether usable detours are available.

Riwayat

  1. Dibuka1 laporan

Siapa yang terlibat

Organisasi

  • Navajo Nation Division of Transportationdivision of the executive branch of the Navajo Nation1 laporan

Tempat

  • Canyon de Chelly National MonumentCanyon de Chelly National Monument, Apache County, AZ, United States of America1 laporan
  • DilkonDilkon, AZ, United States of America1 laporan
  • Mexican SpringsMexican Springs, NM, United States of America1 laporan
  • PinonPinon, AZ, United States of America1 laporan
  • Red MesaRed Mesa, AZ, United States of America1 laporan

Semua media yang kami baca tentang berita ini

25 sumber15 media

Siapa melaporkan apa

24 poin0 dikonfirmasi dua media atau lebih23 hanya dari satu media0 diperdebatkan

Apa yang dilaporkan 2 media tentang berita ini, poin demi poin, dan siapa yang pertama melaporkan tiap poin.

Poin yang dilaporkan lebih dari satu media

Setiap kolom adalah satu media, sesuai urutan pertama kali melaporkan. Pilih tanda untuk membaca kata-kata media tersebut.

  • Pertama melaporkan
  • Melaporkan
  • Mengulang media lain
  • Tidak melaporkan
PoinNational Weather ServiceNavajo TimesMedia
Heavy flooding was reported at Walker Creek Bridge on Navajo Route 35, west of…Belum dikonfirmasi secara independen2

Poin yang hanya dilaporkan satu media

Hanya dilaporkan oleh National Weather Service

Setiap baris adalah klaim sebagaimana kami catat dari laporan media tersebut. Dibandingkan per .

Liputan terkait

  1. Liputan lanjutanSan Juan River rises 1.7 feet in an hour as Farmington-area evacuations ordered
  2. Latar belakangArchuleta flooding leaves structures inundated, key U.S. 160 sections closed