Langsung ke konten
Sekarang

Sedang berkembangHari ke-2

The Moyle Interconnector capacity fault

  1. Pembaruan 1 dari 1TerbaruHari ke-2

    250MW left on Moyle link as fault narrows Northern Ireland’s winter options

    The Moyle Interconnector is down to 250 megawatts with no restoration date announced. SONI’s supply reassurance depends on repairs and the availability of generating stations.

    Tonton

    BBC News

    • 250MWTransfer capacity remaining after the fault
    • 50%Reduction in the link’s reported capacity
    • 500MWEngineering capacity each way, subject to limits
    • Mutual Energy reports 250 megawatts of remaining capacity and has activated recovery protocols.
    • The underlying cause, first-confirmation date and timetable for restoring full capacity remain unestablished.
    • Watch for a dated operator update changing the transfer limit or setting out the repair plan, alongside confirmation of SONI’s applicable seasonal assumptions.

Yang melaporkan

Yang melaporkan

10 media · 16 sumber

5 dari 10 telah melaporkan hingga saat ini

Siapa yang terlibat

Siapa yang terlibat

Organisasi

  • Department for the EconomyNorthern Ireland government department
  • Mutual EnergyEnergy company in Northern Ireland, United Kingdom

Tempat

  • Northern Ireland
  • United Kingdom