In corso
The barge crane strike on Jacksonville’s Hart Bridge
A crane on a southbound barge struck the Jacksonville crossing Wednesday evening. At 9 p.m., inspectors still needed closer access and an additional engineer.
La storia finora
Aggiornamento 1
Hart Bridge closed both ways after crane strike, with no reopening time
A crane on a southbound barge struck the Jacksonville crossing Wednesday evening. At 9 p.m., inspectors still needed closer access and an additional engineer.
Cosa è cambiato
- A crane on a southbound barge strikes the Hart Bridge. FDOT closes both directions as a precaution.
Cronologia
Giorno 1 · 1 servizio
Prima a riferirne
A crane on a southbound barge strikes the Hart Bridge. FDOT closes both directions as a precaution.
Crews are still waiting for an additional engineer. Inspectors have seen the strike location but have not been able to examine it fully.
Chi ne ha riferito
6 testate · 13 fonti
Yahoo Newsyahoo.com · 1
Jacksonville News Nowjacksonvillenewsnow.com1
fdotwww.blob.core.windows.net1
Chi è coinvolto
Organizzazioni
Florida Department of Transportationstate transportation agency in Florida, United States
Luoghi
- EverBank Stadium
