Ir para o conteúdo

Em desenvolvimentoDia 16

Gila River flooding from Painted Rock Dam releases

  1. Atualização 2 de 2Mais recenteDia 1614 dias depois

    Gila River flooding puts crossings at risk as dam releases continue

    The hazard forecast earlier this month is now active below Painted Rock Dam. A warning through November 30 does not set a reopening date for river crossings.

    Ver

    KYMA

    • ~3,000 cfsContinuing releases from Painted Rock Dam
    • Near 10 feetDownstream gauge stage, not road depth
    • Nov. 30, 3 p.m.Warning expiration, Mountain Standard Time
  2. Atualização 1 de 2Dia 3

    Painted Rock releases could reach 3,000 cfs, putting Gila River crossings at risk

    Planned releases are set to rise twelvefold, threatening low-water crossings along the Gila River. Downstream effects could outlast the November 17 warning.

    Ver

    24X7 News

    • Planned rise to 3,000 cubic feet per second, with releases continuing until the reservoir is empty.

Quem noticiou

Quem noticiou

18 órgãos · 38 fontes

10 de 18 já tinham noticiado até este momento

Cronologia

Cronologia

Dia 16 · 2 reportagens

  1. Primeiro a noticiar

  2. Initial release scheduled at 250 cubic feet per second.

  3. Planned increase to 500 cubic feet per second, holding until Thursday morning.

  4. Planned rise to 3,000 cubic feet per second, with releases continuing until the reservoir is empty.

Quem está envolvido

Quem está envolvido

Organizações

  • National Weather ServiceU.S. forecasting agency of the National Oceanic and Atmospheric Administration
  • United States Army Corps of Engineersdirect reporting unit and U.S. Army's branch for military engineering

Locais

  • Dateland
  • Maricopa County
  • Painted Rock Dam

Discussão

Discussão

As publicações aqui pertencem a «Gila River flooding from Painted Rock Dam releases» e aparecem em todas as suas reportagens.

Gila River flooding puts crossings at risk as dam releases continue