Технологии · Gaming GPUs
Moore Threads’ Lushan pitch has big numbers—and an old performance promise
A possible 64GB configuration and dramatic gains over the MTT S80 make an eye-catching pitch. Final specifications and independent gaming results remain missing.
Текст 4 мин чтения · 17 источников
Доступно на английском
Moore Threads’ latest Lushan teaser returns to a promise that predates this round of promotion: a dramatic gaming leap over its MTT S80 graphics card. The same claims of up to 15 times the gaming performance and 50 times the ray-tracing performance appeared in December 2025 reporting. November 2026 brings renewed attention to the forthcoming GPU, but not independent results showing what those multipliers mean in play.17
Опрос читателей
What would matter most in deciding whether to wait for Lushan?
The next concrete checkpoint is the MUSA Developer Conference, scheduled for December 29–30, 2026, in Beijing. Lushan is expected to be introduced there. That makes the event worth watching, not a release date worth planning a purchase around: final memory capacity, price, power requirements and retail availability remain unconfirmed in the reporting available for this teaser.11112
The Chinese chipmaker is advertising something potentially significant within its own lineup. Whether it has built a compelling alternative to competing graphics cards is a different question—and the headline numbers do not yet answer it.
Three numbers, three different meanings
According to TechSpot’s November 28 report, Moore Threads claims up to 15 times the MTT S80’s performance in triple-A, or big-budget, games, and 50 times its performance in ray-traced lighting effects. The possible memory configuration is up to 64GB of GDDR6. These are not three interchangeable measures of how fast a game will run.1
The gaming multiplier is an advertised upper limit against one older Moore Threads product. It is not a promise of a fifteenfold improvement in every title. The ray-tracing multiplier concerns lighting effects, rather than establishing that an entire game will run fifty times faster. Neither number supplies an absolute frame rate or places Lushan alongside a rival card.12
The missing test conditions are therefore central to the story, not technical footnotes. The available reporting provides no named games beyond the broad triple-A category, resolutions, graphics settings, test-computer configuration, driver versions, measured frame rates or precise ray-tracing workload behind the comparisons. Without those, buyers cannot tell whether the advertised gains resemble the situations in which they would use the card.24
The memory figure needs a separate qualification. Moore Threads previously indicated that its next generation could carry four times the MTT S80’s memory. The S80 has 16GB of GDDR6; four times that is 64GB. That arithmetic explains the possibility, but it is not a confirmed specification for a final retail Lushan card. Chip Dispatch explicitly distinguishes the inference from a confirmed configuration.110
For scale, Nvidia’s GeForce RTX 5090 has 32GB of memory, so the possible Lushan configuration would offer twice that capacity. It would not, by itself, establish faster gaming. Memory capacity describes how much data the card can hold; frame rate describes how quickly it produces images. A larger allocation cannot validate either performance multiplier.1
Modern features still need proving
Lushan is described as using Moore Threads’ Huagang architecture, with DirectX 12 Ultimate and hardware ray tracing among its advertised capabilities. Those features speak to the chip’s intended gaming role. They do not independently demonstrate how quickly, consistently or reliably it will deliver those capabilities in particular games.38
There is software work behind the hardware pitch. TechSpot reports that Moore Threads has released several updates to its Windows graphics drivers and says the S80 is improving in tests including 3DMark Fire Strike. That is relevant evidence of continued development, but it is still a company-reported account of another card’s progress. Lushan needs its own testing for speed, consistency and compatibility.1
The chronology also deserves a clear boundary. Tom’s Hardware reported the same 15-times gaming and 50-times ray-tracing promises in an account dated December 21, 2025, describing a next-generation GPU unveiling. The November 2026 promotion does not explain whether it represents a distinct technical milestone or a continuation of that earlier announcement. Repetition is not evidence of a newly measured gain; nor does the unresolved relationship prove the current teaser is invalid.71
What December can actually settle
The conference dates are firmer than the expectation of a Lushan introduction. Moore Threads’ official developer listings confirm December 29–30, 2026. Beijing is identified as the host city in reporting on the event. The official schedule evidence available here does not identify a presentation specifically named for Lushan, so its expected appearance should not be converted into a confirmed agenda slot.1214154
Известно
Неизвестно
- The final retail memory configuration, independent gaming performance, price, board power requirement and purchase date remain unconfirmed.
Что дальше
- Watch for final specifications, reproducible benchmark conditions and an availability timetable—not just another statement of the same multipliers.
For someone weighing a graphics-card purchase, those omissions are practical. Price determines whether the product belongs on the shortlist. Power requirements help establish whether it fits the intended computer. Tests in the buyer’s own games reveal whether a striking comparison against the S80 translates into an experience worth paying for.
December’s conference can move Lushan from an intriguing promise toward a product buyers can evaluate. Until then, the strongest conclusion is narrower than the promotion: Moore Threads is promising a major advance over its earlier card. How much that advance is worth remains to be demonstrated.
Источники14
Для контекста изучено 5 более ранних материалов.3 издания без даты:
Все источники по изданиям
17 источников из 14 изданий· Сначала самые цитируемые
Chip Dispatchchipdispatch.com2
Tom's Hardwaretomshardware.comПервым2
- Впервые сообщило
- Moore Threads' next 'Lushan' gaming GPU could pack a record 64GB of VRAM — doubles the RTX 5090's 32GB, lofty claims of 15x gaming and 50x ray tracing over MTT S80
- Moore Threads unveils next-gen gaming GPU with 15x performance and 50x ray tracing improvement — AI GPU with claimed performance between Hopper and Blackwell also in the works
摩尔线程开发者mthreads.com2
BaiduWikibaidu.com1
ComputerBasecomputerbase.de1
Hardware Bustershwbusters.com1
igor´sLABigorslab.de1
- Впервые сообщило
- Moore Threads Lushan: 64 GB VRAM Still Unconfirmed
jinguxun.com1
- Впервые сообщило
- 国产GPU开发者盛会,来了!
Notebookchecknotebookcheck.net1
Spec TECH Newsspec-tech-news.com1
- Впервые сообщило
- Moore Threads teases a Lushan GPU with 64 GB of memory
TechSpottechspot.com1
Как вышло в эфир
- Moore Threads promises up to fifteen times the MTT S80's gaming performance.
- Its forthcoming Lushan graphics chip could also carry 64 gigabytes of video memory. For gamers considering their next purchase, those numbers suggest a substantial upgrade within the company's lineup.
- The question is how much those promises tell buyers about the games they'll actually play.
- Chinese chipmaker Moore Threads is promoting Lushan as its next gaming graphics processor. The comparison behind its biggest performance claims is the company's own MTT S80, an earlier card with 16 gigabytes of GDDR6 video memory.
- Moore Threads claims up to fifteen times the MTT S80's performance in triple-A games, and fifty times its performance in ray-traced lighting. The possible memory capacity is 64 gigabytes. Independent tests haven't yet validated those performance claims.
- Triple-A means big-budget games. The fifteen-times figure is a claimed upper limit against that older card. Results can vary from game to game. The fifty-times promise covers ray-traced lighting effects. Those multipliers alone don't tell buyers what frame rates they'll get, or where Lushan ranks against competing cards.
- Moore Threads hasn't supplied the testing conditions behind those multipliers. A useful comparison would tie named games and measured frame rates to the resolution, graphics settings and driver used. The test computer and exact ray-tracing workload also affect the result.
- Subscribe to this channel to follow whether Lushan's eventual gaming results match these promises.
- The 64-gigabyte possibility comes from an earlier indication that the next generation could have four times the MTT S80's memory. That card has 16 gigabytes. Multiplying by four gives 64, but Moore Threads hasn't confirmed that capacity for a final retail Lushan card.
- For scale, Nvidia's GeForce RTX 5090 has 32 gigabytes of memory. Lushan's possible capacity would be twice that. Memory holds data a game uses. Frame rates measure how quickly the card produces images, so capacity alone can't validate either performance multiplier.
- Lushan uses Moore Threads' Huagang architecture, the underlying design of the chip. Its advertised features include DirectX 12 Ultimate, a set of modern graphics capabilities, and hardware ray tracing, which helps calculate lighting and reflections.
- Buyers also need dependable game support. Moore Threads has released several updates to its Windows graphics drivers, the software connecting games to the hardware. The company says the S80 is improving in tests including 3DMark Fire Strike. Lushan still needs its own real-world testing for speed, consistency and compatibility.
- Moore Threads was already making the same fifteen-times gaming and fifty-times ray-tracing promises in December 2025. They resurfaced in November 2026. Nobody has explained whether the latest promotion marks a separate technical step or continues that earlier announcement.
- The next scheduled checkpoint is in Beijing. Moore Threads' MUSA Developer Conference runs on December 29th and 30th, 2026. The company has confirmed those conference dates, and Lushan is expected to be introduced there.
- The December 29th and 30th conference offers a concrete opportunity for Moore Threads to explain Lushan in detail. Its introduction is still an expectation. The official schedule information available so far doesn't identify a presentation specifically named for Lushan.
- For someone deciding whether to wait before buying a graphics card, useful evidence would include a final memory configuration and reproducible gaming results. Tests in the games they use would show how far the advertised gains carry into everyday play.
- Moore Threads hasn't announced a price. Buyers also need the card's power requirement to check whether it fits their computers. The December conference could bring those details, but the company hasn't announced when customers will be able to buy Lushan.
Обсуждение
Публикации здесь относятся к сюжету «Moore Threads Lushan gaming GPU» и видны во всех его репортажах.
Недавно в эфире

Доступно на английском
Fireworks meant for the sky hit Myanmar festival crowd, injuring 16

Доступно на английском
Hospital transfer costs Álex Márquez two Valencia farewells

Доступно на английском
Adam Caporn inherits the Wizards—and the demand for a new voice

Доступно на английском
Nizhyn strike toll rises to seven as Ukraine’s national count fails to add up

Доступно на английском
Kelly Osbourne says she ended Sid Wilson engagement because it ‘wasn’t healthy’

Доступно на английском
San Juan County faces Sunday flood warning, with a higher-risk range Monday