Перейти к содержимому
Сейчас

Затихло с День 1

The Big Bend border infrastructure plan review

  1. Обновление 1 из 1ПоследнееДень 1

    $1.72B Big Bend Work Paused After Bulldozer Outrage

    Bulldozer videos forced a halt to $1.72B barrier work in Big Bend, but CBP has promised only time — at least through August — not a new plan.

    Смотреть
    • Heavy equipment tied to a $1.72 billion contract began preliminary park work in early August for barriers and roads under waived rules.
    • All border security construction work in the park was temporarily suspended after Aug. 17.
    • No published redesign, final footprint, long-term timeline, or binding commitment on what will or will not be built in the park.
    • No verified totals for the wider sector plan, apprehensions, or additional contractors from the sources provided.
    • Whether CBP publishes specific redesign options before crews are cleared to return.
    • Whether the end-of-August floor becomes an extension, a scaled-back plan, or a quiet restart.

Кто сообщил

Кто сообщил

8 изданий · 11 источников · 1 видео

К этому моменту сообщили 0 из 8

Кто причастен

Кто причастен

Люди

  • Greg AbbottGovernor of Texas since 2015
  • John CornynAmerican politician and attorney (born 1952)
  • Markwayne MullinAmerican politician (born 1977)
  • Rodney ScottAmerican chief of border patrol

Места

  • Big Bend National Park
  • Big Bend Ranch State Park
  • Black Gap Wildlife Management Area
  • Santa Elena Canyon Trail
  • Terrell County