Habari inayoendelea · ripoti 1
The Big Bend border infrastructure plan review
InaendeleaUkaguzi ujao : CBP’s decision whether to resume, redesign, or abandon the broader Big Bend sector plan after its review.
Hali ilivyo
Construction of the $1.7 billion project inside Big Bend National Park was paused after protests. CBP is reviewing the broader $7.5 billion plan for the 517-mile sector and considering redesign options; its decision on whether or how work proceeds remains open, as of the report aired August 23, 2026.
Ufuatiliaji wa habariSiku ya 1
1 ripoti8 vyombo vya habari11 vyanzo1 video
Habari hadi sasa
$1.72B Big Bend Work Paused After Bulldozer Outrage
Bulldozer videos forced a halt to $1.72B barrier work in Big Bend, but CBP has promised only time — at least through August — not a new plan.
Bado haijajibiwa baada ya ripoti hii
- No published redesign, final footprint, long-term timeline, or binding commitment on what will or will not be built in the park.
- No verified totals for the wider sector plan, apprehensions, or additional contractors from the sources provided.
Historia
Ilifunguliwaripoti 1
Wanaohusika
Watu
Greg AbbottGovernor of Texas since 2015Ripoti 1
John CornynAmerican politician and attorney (born 1952)Ripoti 1
Markwayne MullinAmerican politician (born 1977)Ripoti 1
Rodney ScottAmerican chief of border patrolRipoti 1
Maeneo
- Big Bend National ParkTexas, USARipoti 1
- Big Bend Ranch State Park21800 FM170, Terlingua, TX 79852, USARipoti 1
- Black Gap Wildlife Management AreaAlpine, TX 79830, USARipoti 1
- Santa Elena Canyon TrailSanta Elena Canyon Trail, Texas 79852, USARipoti 1
- Terrell CountyTerrell County, TX, USARipoti 1
Kila chombo cha habari tulichosoma kuhusu habari hii
11 vyanzo8 vyombo vya habari1 video
HeyDay News1video 1
