Hakiko hewani

Habari inayoendelea · ripoti 1

The Big Bend border infrastructure plan review

Ilirushwa kwa mara ya kwanza Ilirushwa hivi punde

InaendeleaUkaguzi ujao : CBP’s decision whether to resume, redesign, or abandon the broader Big Bend sector plan after its review.

Hali ilivyo

Construction of the $1.7 billion project inside Big Bend National Park was paused after protests. CBP is reviewing the broader $7.5 billion plan for the 517-mile sector and considering redesign options; its decision on whether or how work proceeds remains open, as of the report aired August 23, 2026.

Ufuatiliaji wa habariSiku ya 1

1 ripoti8 vyombo vya habari11 vyanzo1 video

Habari hadi sasa

  1. Sasisho 1

    $1.72B Big Bend Work Paused After Bulldozer Outrage

    Bulldozer videos forced a halt to $1.72B barrier work in Big Bend, but CBP has promised only time — at least through August — not a new plan.

    Bado haijajibiwa baada ya ripoti hii

    • No published redesign, final footprint, long-term timeline, or binding commitment on what will or will not be built in the park.
    • No verified totals for the wider sector plan, apprehensions, or additional contractors from the sources provided.

Historia

  1. Ilifunguliwaripoti 1

Wanaohusika

Watu

  • Greg AbbottGovernor of Texas since 2015Ripoti 1
  • John CornynAmerican politician and attorney (born 1952)Ripoti 1
  • Markwayne MullinAmerican politician (born 1977)Ripoti 1
  • Rodney ScottAmerican chief of border patrolRipoti 1

Maeneo

  • Big Bend National ParkTexas, USARipoti 1
  • Big Bend Ranch State Park21800 FM170, Terlingua, TX 79852, USARipoti 1
  • Black Gap Wildlife Management AreaAlpine, TX 79830, USARipoti 1
  • Santa Elena Canyon TrailSanta Elena Canyon Trail, Texas 79852, USARipoti 1
  • Terrell CountyTerrell County, TX, USARipoti 1

Kila chombo cha habari tulichosoma kuhusu habari hii

11 vyanzo8 vyombo vya habari1 video