Ruka hadi kwenye maudhui
Sasa

InaendeleaSiku ya 2

The Moyle Interconnector capacity fault

  1. Taarifa mpya ya 1 kati ya 1Ya hivi karibuniSiku ya 2

    250MW left on Moyle link as fault narrows Northern Ireland’s winter options

    The Moyle Interconnector is down to 250 megawatts with no restoration date announced. SONI’s supply reassurance depends on repairs and the availability of generating stations.

    Tazama

    BBC News

    • 250MWTransfer capacity remaining after the fault
    • 50%Reduction in the link’s reported capacity
    • 500MWEngineering capacity each way, subject to limits
    • Mutual Energy reports 250 megawatts of remaining capacity and has activated recovery protocols.
    • The underlying cause, first-confirmation date and timetable for restoring full capacity remain unestablished.
    • Watch for a dated operator update changing the transfer limit or setting out the repair plan, alongside confirmation of SONI’s applicable seasonal assumptions.

Walioripoti

Walioripoti

10 vyombo vya habari · 16 vyanzo

5 kati ya 10 vilikuwa vimeripoti kufikia wakati huu

Wanaohusika

Wanaohusika

Mashirika

  • Department for the EconomyNorthern Ireland government department
  • Mutual EnergyEnergy company in Northern Ireland, United Kingdom

Maeneo

  • Northern Ireland
  • United Kingdom