İçeriğe geç
Şimdi

Gelişiyor3. gün

Gila River flooding from Painted Rock Dam releases

  1. Güncelleme 1/1En son3. gün

    Painted Rock releases could reach 3,000 cfs, putting Gila River crossings at risk

    Planned releases are set to rise twelvefold, threatening low-water crossings along the Gila River. Downstream effects could outlast the November 17 warning.

    İzle

    24X7 News

    • Planned rise to 3,000 cubic feet per second, with releases continuing until the reservoir is empty.

Kim bildirdi

Kim bildirdi

9 yayın organı · 20 kaynak

Bu ana kadar 9 kaynaktan 4 tanesi haber yapmıştı

Zaman çizelgesi

Zaman çizelgesi

3. gün · 1 haber

  1. İlk bildiren

  2. Initial release scheduled at 250 cubic feet per second.

  3. Planned increase to 500 cubic feet per second, holding until Thursday morning.

Kimler dahil

Kimler dahil

Kuruluşlar

  • National Weather ServiceU.S. forecasting agency of the National Oceanic and Atmospheric Administration
  • United States Army Corps of Engineersdirect reporting unit and U.S. Army's branch for military engineering

Yerler

  • Dateland
  • Maricopa County
  • Painted Rock Dam