İçeriğe geç
Şimdi

Gelişiyor2. gün

The Moyle Interconnector capacity fault

  1. Güncelleme 1/1En son2. gün

    250MW left on Moyle link as fault narrows Northern Ireland’s winter options

    The Moyle Interconnector is down to 250 megawatts with no restoration date announced. SONI’s supply reassurance depends on repairs and the availability of generating stations.

    İzle

    BBC News

    • 250MWTransfer capacity remaining after the fault
    • 50%Reduction in the link’s reported capacity
    • 500MWEngineering capacity each way, subject to limits
    • Mutual Energy reports 250 megawatts of remaining capacity and has activated recovery protocols.
    • The underlying cause, first-confirmation date and timetable for restoring full capacity remain unestablished.
    • Watch for a dated operator update changing the transfer limit or setting out the repair plan, alongside confirmation of SONI’s applicable seasonal assumptions.

Kim bildirdi

Kim bildirdi

10 yayın organı · 16 kaynak

Bu ana kadar 10 kaynaktan 5 tanesi haber yapmıştı

Kimler dahil

Kimler dahil

Kuruluşlar

  • Department for the EconomyNorthern Ireland government department
  • Mutual EnergyEnergy company in Northern Ireland, United Kingdom

Yerler

  • Northern Ireland
  • United Kingdom