未播出

國際 · Berlin Rearms

Germany's First F-35: A 10-Billion-Euro Bet on Deterrence

One jet in Texas, 34 to go: what Berlin's stealth-fighter handover says about rearmament, nuclear sharing, and reliance on Washington.

提供英文版

原語言影片

逐字稿 · 載入中

Ten billion euros is what Germany has now put on a single runway. That is the reported price for 35 American stealth fighters, of which exactly one is in German hands — accepted this month in Texas after a three-year build, with 34 still to come. It is a staggering sum by the standards of a country that spent decades keeping its army short, and it tells you how completely Russia's 2022 invasion of Ukraine rewrote Berlin's idea of what security costs. 1

關鍵事實

  1. 35F-35 jets on order for Luftwaffe 1
  2. 1Jet delivered so far in Texas 1
  3. ~€10BReported order value, no breakdown 1
  4. 100+US nuclear bombs cited in Europe 1

Defense Minister Boris Pistorius took formal delivery of that first F-35 at Lockheed Martin's production facility in Texas, calling the moment a new era for the Luftwaffe and for NATO deterrence. The language was deliberate. This was not presented as a routine procurement, but as a break with post-Cold War restraint and the most concrete step yet in Germany's turn toward rearmament. 1

That turn began in February 2022. Russia's full-scale invasion of Ukraine overturned decades of German reluctance to invest heavily in defense, and the order for 35 F-35s followed directly from that shock. Each aircraft takes about three years to build, which is why the handover now begins a long rollout rather than an instant capability: delivery, acceptance testing and pilot conversion will continue over the coming months and years before there is a real fleet to speak of. 1

From invasion to first delivery

From invasion to first delivery

  1. Feb 2022

    Russia invades Ukraine, overturning German defense restraint.

    1
  2. 2022

    Germany orders 35 F-35s for around 10 billion euros.

    1
  3. Sep 2026

    First jet delivered to Pistorius in Texas.

    1

The aircraft itself is meant to close a Cold War chapter. The Luftwaffe's Tornado jets — 1980s-era strike and reconnaissance workhorses, repeatedly upgraded but increasingly old — are to be replaced by a fifth-generation stealth aircraft with advanced sensor fusion and, crucially, nuclear capability. Its planned operational home is Buechel in western Germany, the small base that has hosted NATO's nuclear-sharing mission for decades. 1

地點

  1. 1Texas, United States
  2. 2Buechel, Germany

That basing choice is what lifts this story beyond conventional airpower. Under NATO nuclear sharing, German aircraft are assigned to carry American nuclear weapons in wartime while the weapons themselves remain under American custody. The Tornado performed that role; the F-35 is designed to take it over. The delivery comes against the backdrop of more than 100 US nuclear bombs reportedly held across Europe as part of that deterrence posture. 1

For NATO, the practical payoff is interoperability. A common stealth platform flown by several allies makes joint operations, maintenance, training and data-sharing far simpler than a patchwork of national types, and it keeps Germany tied directly into the alliance's nuclear deterrence mission at a moment when credibility matters. In that sense Pistorius is right: one jet in Texas already signals a different Luftwaffe, one built to plug into allied airpower rather than stand apart from it. 1

But the same fact exposes the contradiction at the heart of Europe's defense debate. The continent's most consequential new capability still runs through American-made hardware and American-controlled arrangements — from the production line in Texas to custody of the weapons at Buechel to software, spares and upgrades for decades to come. That dependence sits uneasily with loud European calls for strategic autonomy, the idea that Europe should be able to act, and deter, on its own. 1

The numbers also invite skepticism. The reported figure of around 10 billion euros comes with no breakdown between airframes, support, weapons, training and infrastructure at Buechel, and history suggests the full program cost will be higher once all of that is added. With no published schedule for the remaining 34 jets, no confirmed date for full operational capability, and no precise public definition of the fleet's nuclear role, the headline sum is a placeholder as much as a price. 1

已知

  • Germany accepted its first of 35 F-35s in Texas in September 2026. 1
  • The order is reported at around 10 billion euros with no cost breakdown. 1
  • The nuclear-capable jets will replace Tornados with planned basing at Buechel. 1

未知

  • No published schedule for the remaining 34 jets and full operational capability.
  • No full program cost including training, weapons and Buechel infrastructure.
  • No precise public definition of the fleet's nuclear role.

後續

  • Watch acceptance testing, pilot training and movement of jets to Buechel.
  • Watch for a detailed cost and delivery timetable from Berlin.

There is a final caveat that matters. The entire account of this handover, the cost, the basing plan and the nuclear context comes from a single outlet's report, DW News, published on September 19, 2026, with no independent corroboration obtained. That does not make it wrong, but it means the scale of the bet is clearer than its terms. Germany has bought into American deterrence for the next generation; what that will cost, when it will fly from German soil, and how independent it leaves Europe are still open questions. 1

播出版本 10 行
  1. Germany has taken delivery of its first F-35 stealth fighter — a ten-billion-euro bet on nuclear deterrence. Defense Minister Boris Pistorius accepted the aircraft at Lockheed Martin's Texas facility, calling it a new era for the Luftwaffe and NATO. The jet is the first of 35, nuclear-capable, and set to replace the aging Tornado at Buechel in western Germany. With 34 more jets to come, can Europe call itself strategically independent?
  2. That ten-billion-euro contract covers 35 jets, each taking about three years to build. That works out to roughly 285 million euros per jet. But the figure comes with no breakdown between the aircraft themselves, support, and infrastructure. And it's a figure that sits in stark contrast to Germany's post-Cold War defense budgets, which were famously tight for decades.
  3. The order was a direct response to Russia's invasion, a moment that overturned decades of German reluctance to invest heavily in defense. That invasion rewrote Germany's security calculus, and this delivery is the most concrete result. The decision to buy American F-35s was a break from the past, signaling a new willingness to spend on defense. Today, the first jet is in German hands, but it's a single aircraft among many more to come.
  4. The jet was handed over in Texas, but its operational home will be Buechel in western Germany — the same base that has hosted NATO's nuclear mission for decades. That makes this delivery as much about deterrence as it is about airpower.
  5. The Tornado has been the Luftwaffe's strike workhorse since the Cold War. It first entered service in the 1980s and has been upgraded repeatedly. The F-35 was built to take over that role, with a modern stealth design, advanced sensor fusion, and the ability to carry nuclear weapons.
  6. From the production line in Texas to the forests of western Germany, this jet's journey spans an ocean. At Buechel, it will join an existing nuclear mission that has been in place since the Cold War. The base is a small military installation, but it's been at the center of NATO's deterrence strategy for decades.
  7. Just one jet has arrived so far. The remaining 34 will be delivered over the coming months, with testing and pilot training continuing. Only after that will the fleet be fully operational at Buechel. That's a process that will take years to complete.
  8. The nuclear dimension is why this delivery matters beyond conventional airpower. Buechel has been the home of NATO's nuclear sharing mission for decades. Under that arrangement, the Tornado has carried US nuclear weapons, and the F-35 is designed to take over that role. More than 100 US nuclear bombs are held across Europe under NATO arrangements. The weapons themselves remain under American custody, even though German aircraft would carry them. That's part of the dependence that unsettles Berlin. But many questions remain open: when exactly the other 34 jets arrive, what the full program will cost once weapons, training, and infrastructure are added, and what nuclear role the fleet will ultimately play.
  9. For NATO, the F-35 means greater interoperability — a common platform across allied air forces, tying Germany into the alliance's nuclear mission. But it also underscores Europe's dependence on American-made hardware and American control — a tension with calls for strategic autonomy.
  10. So what happens next? The remaining 34 jets are to be delivered over the coming months, with testing and pilot training continuing. The full cost of the program — including weapons, training, and infrastructure at Buechel — has not been published. And the precise nuclear role these jets will play remains to be defined. This first F-35 stands as both a promise and a question mark for Germany's rearmament. The questions of timing, cost, and nuclear role are still open. And the broader question of Europe's strategic autonomy is far from settled.

來源

追溯這篇報導背後的證據。關聯圖呈現各項連結;點選下方連結可開啟本文引用的來源。

來源關聯圖會在您閱讀時載入。

引用來源

  1. Germany's military makeover: First F-35 fighter jet delivered | DW NewsDW News · 9月18日 · 影片

修訂紀錄

  1. r1首次發布。