Naar inhoud
Nu

In ontwikkelingDag 2

The Moyle Interconnector capacity fault

  1. Update 1 van 1NieuwsteDag 2

    250MW left on Moyle link as fault narrows Northern Ireland’s winter options

    The Moyle Interconnector is down to 250 megawatts with no restoration date announced. SONI’s supply reassurance depends on repairs and the availability of generating stations.

    Kijken

    BBC News

    • 250MWTransfer capacity remaining after the fault
    • 50%Reduction in the link’s reported capacity
    • 500MWEngineering capacity each way, subject to limits
    • Mutual Energy reports 250 megawatts of remaining capacity and has activated recovery protocols.
    • The underlying cause, first-confirmation date and timetable for restoring full capacity remain unestablished.
    • Watch for a dated operator update changing the transfer limit or setting out the repair plan, alongside confirmation of SONI’s applicable seasonal assumptions.

Wie meldde het

Wie meldde het

10 media · 16 bronnen

5 van de 10 hadden op dit moment bericht

Wie erbij betrokken is

Wie erbij betrokken is

Organisaties

  • Department for the EconomyNorthern Ireland government department
  • Mutual EnergyEnergy company in Northern Ireland, United Kingdom

Plaatsen

  • Northern Ireland
  • United Kingdom