Chuyển đến nội dung

Đang diễn biếnNgày thứ 16

Gila River flooding from Painted Rock Dam releases

  1. Cập nhật 2/2Mới nhấtNgày thứ 1614 ngày sau

    Gila River flooding puts crossings at risk as dam releases continue

    The hazard forecast earlier this month is now active below Painted Rock Dam. A warning through November 30 does not set a reopening date for river crossings.

    Xem

    KYMA

    • ~3,000 cfsContinuing releases from Painted Rock Dam
    • Near 10 feetDownstream gauge stage, not road depth
    • Nov. 30, 3 p.m.Warning expiration, Mountain Standard Time
  2. Cập nhật 1/2Ngày thứ 3

    Painted Rock releases could reach 3,000 cfs, putting Gila River crossings at risk

    Planned releases are set to rise twelvefold, threatening low-water crossings along the Gila River. Downstream effects could outlast the November 17 warning.

    Xem

    24X7 News

    • Planned rise to 3,000 cubic feet per second, with releases continuing until the reservoir is empty.

Ai đưa tin

Ai đưa tin

18 cơ quan báo chí · 38 nguồn

10/18 đã đưa tin vào thời điểm này

Dòng thời gian

Dòng thời gian

Ngày thứ 16 · 2 bản tin

  1. Đưa tin đầu tiên

  2. Initial release scheduled at 250 cubic feet per second.

  3. Planned increase to 500 cubic feet per second, holding until Thursday morning.

  4. Planned rise to 3,000 cubic feet per second, with releases continuing until the reservoir is empty.

Những ai liên quan

Những ai liên quan

Tổ chức

  • National Weather ServiceU.S. forecasting agency of the National Oceanic and Atmospheric Administration
  • United States Army Corps of Engineersdirect reporting unit and U.S. Army's branch for military engineering

Địa điểm

  • Dateland
  • Maricopa County
  • Painted Rock Dam

Thảo luận

Thảo luận

Bài đăng ở đây thuộc về “Gila River flooding from Painted Rock Dam releases” và xuất hiện trên mọi bản tin về tin này.

Gila River flooding puts crossings at risk as dam releases continue